OUR PLANT

S3 operates the first cement grinder plant in East Kalimantan
~50 km from the New Capital City (IKN)

Our Cement grinder plant is strategically located in East Kalimantan,
at approx. 50 km from the proposed new capital location

Peta
PANORAMIC SIDE - Edited
  • Our plant is strategically located near the new capital, between the 2 largest cities in the Province (Balikpapan and Samarinda)

 

  • Our plant is located at the mouth of the Mahakam river in East Kalimantan province and close to the cruise line for all ships coming to and departing from the city of Samarinda.

 

  • The cruise line is also widely used for transporting coal from East Kalimantan to other regions.

 

  • Our private port offers flexibility and easy access to raw materials and transportation of finished products.
Group 622
Group 623
Group 624
Group 625
BALL MILL 1 3

FACILITY

Fully operational cement plant with state-of-the-art equipment

 

Access to shipping routes through in-house jetty

 

Technically distinguished equipment suppliers:
Thyssenkrupp,E-Crane etc.

RAW MATERIAL STORAGE

Clinker Storage
Capacity: 40.000 Tons

Gypsum Storage
Capacity: 6.000 Tons

Additive Storage
Capacity: 3.000 Tons

CEMENT MILL

Ball Mill
Capacity: 110 tph

Bag House
Dust Load Inet: 700 gm/m3

Cement Siloe
Capacity: 2 x 6000 Tons

Packing Plant
Loading Capacity: 120 tph

JETTY

Jetty Feed
300 Ft Barge

Gypsum Storage
8000 Dwt

*Expandable to 3 Mtpa Load

GALLERY